The 20th caisson for Genoa’s New Breakwater has been installed.

The 20th caisson for Genoa’s New Breakwater has been installed.

93 in total, 60 vessels at sea, 500 days of underwater operations: a construction project unmatched in Europe.

F&M Ingegneria prepared the detailed design for Phase A, in collaboration with Ramboll UK.

To learn more, read the article in Genova24 and Shipping Italy